Duration: Project was on hold post 1st lock down and have been completed
Type: Commercial
WB Role – Scope – Design & Design coordination, IPS Works, Supply & Installation of tiles, wooden flooring works All Gypsum & Pop Works, All Fixed & loose furniture including in room items, Deccoretive lights & Artworks.
Keys – 108 (54 villas with two rooms & Living Room)